{"id":74705,"date":"2018-08-05T17:13:57","date_gmt":"2018-08-05T12:13:57","guid":{"rendered":"https:\/\/tns.world\/?p=74705"},"modified":"2018-08-05T17:13:57","modified_gmt":"2018-08-05T12:13:57","slug":"pak-railways-main-line-to-be-upgraded-under-phased-program-minister","status":"publish","type":"post","link":"https:\/\/tns.world\/?p=74705","title":{"rendered":"Pak Railways&#8217; main line to be upgraded under phased program: minister"},"content":{"rendered":"<p style=\"text-align: justify; background: white; margin: 0in 0in 7.5pt 0in;\">\n<p style=\"text-align: justify; background: white; margin: 0in 0in 7.5pt 0in;\"><span style=\"font-size: 11.5pt; font-family: 'Arial','sans-serif'; color: #333333;\">Islamabad, Aug. 5 (TNS): Under China Pakistan Economic Corridor, the Main Line-One of Pakistan Railways from Karachi to Peshawar and Taxila to Havelian will be expanded and upgraded at a cost of 3.40 billion dollars under a phased programme.<\/span><\/p>\n<p style=\"text-align: justify; background: white; box-sizing: border-box; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; margin: 0in 0in 7.5pt 0in;\"><span style=\"font-size: 11.5pt; font-family: 'Arial','sans-serif'; color: #333333;\">This was stated by Caretaker Minister for Railways, Roshan Khursheed Bharocha in an exclusive interview with our Radio Pakistan Bahawalpur Correspondent Sajjad Parvez.<\/span><\/p>\n<p style=\"text-align: justify; background: white; box-sizing: border-box; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; margin: 0in 0in 7.5pt 0in;\"><span style=\"font-size: 11.5pt; font-family: 'Arial','sans-serif'; color: #333333;\">She said final draft of six sub-projects of Phase-1 for the expansion and up gradation of Main Line-One has already been submitted to Ministry of Planning Development and Reform for approval.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad, Aug. 5 (TNS): Under China Pakistan Economic Corridor, the Main Line-One of Pakistan Railways from Karachi to Peshawar and Taxila to Havelian will be expanded and upgraded at a cost of 3.40 billion dollars under a phased programme. This was stated by Caretaker Minister for Railways, Roshan Khursheed Bharocha in an exclusive interview with [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":48154,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[54,23],"tags":[],"class_list":["post-74705","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-islamabad","category-national"],"_links":{"self":[{"href":"https:\/\/tns.world\/index.php?rest_route=\/wp\/v2\/posts\/74705","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tns.world\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tns.world\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tns.world\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tns.world\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=74705"}],"version-history":[{"count":1,"href":"https:\/\/tns.world\/index.php?rest_route=\/wp\/v2\/posts\/74705\/revisions"}],"predecessor-version":[{"id":74706,"href":"https:\/\/tns.world\/index.php?rest_route=\/wp\/v2\/posts\/74705\/revisions\/74706"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tns.world\/index.php?rest_route=\/wp\/v2\/media\/48154"}],"wp:attachment":[{"href":"https:\/\/tns.world\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=74705"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tns.world\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=74705"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tns.world\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=74705"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}